top of page
Perma Ballast® Installation
BTI: Experienced, Versatile, Efficient
Installation
Since 1983, BTI has installed more than a half-million net tons of Perma Ballast® worldwide.
-
Perma Ballast® raw material is mixed with water and pumped into the vessel using a combination of rigid and flexible piping.
-
Our products are engineered to assure even distribution of the Perma Ballast® material around projections and pipes, and through openings to ensure that no void areas remain.
-
Excess water is removed while the Perma Ballast® is installed and settles, and the in-place product becomes a dense mass that will not move or shift.
bottom of page